---
title: "The costing: Rates & Charges tab"
space: "Setup Guide"
url: "https://jmtradelink.com/setup/cost-the-deal/04-costing-rates-and-charges"
updated: "2026-11-12"
---

The **Rates & Charges** tab holds every cost of the deal: the rice, the bags, the port charges, the sea freight and the charges at the port of discharge. It also holds the exchange rates that change foreign money to rupees.

At the end of this page, you can check each charge of a costing and get fresh rates when a rate is old.

## Before you start

- Read [The costing: Deal and Cargo tabs](/setup/cost-the-deal/03-costing-deal-and-cargo).
- In the demo, open the **Won** costing of the story (JMC-PI-2627-017).

## Steps

1. Open the costing and click the **Rates & Charges** tab.
2. Read the **Exchange Rates** section.

   ![The Exchange Rates section, with the USD and EUR rows boxed](/files/setup-2-04-costing-rates-and-charges-01-exchange-rates-1883447e.webp)

   - **Exchange Rates** shows one row for each foreign currency in the costing. **Base Rate (INR)** is the rate of the **Rate Date**. In the demo, USD is 93.75 and EUR is 104.71.
   - **FX Buffer** is a safety margin in rupees. In the demo it is 1.000. The system adds it to the base rate, so **Buffered Rate (INR)** is 94.75 for USD. Costs are changed to rupees at the buffered rate. Quote prices are changed at the base rate.

3. Read the **Charges** table. Each row is one cost.

   ![The Charges table of the story costing, with the Procurement Cost, Bags and Sea Freight rows boxed](/files/setup-2-04-costing-rates-and-charges-02-charges-table-eb60c656.webp)

| Column | What it means | Example from the demo |
|---|---|---|
| **Cost Head** | The name of the cost. | Procurement Cost (the rice) |
| **Qty Basis** | What the rate is for: one net MT, one bag, one container, one bill of lading. | Per Net MT |
| **Qty** | How many of the Qty Basis the deal has. | 53.860 |
| **Stage** | The point of the trip where the cost is paid: **Ex-Works**, **FOB**, **CFR** or **Destination**. | Ex-Works |
| **Currency** | The currency of the rate. | INR |
| **Rate** | The price for one unit of the Qty Basis. | 29,900 |
| **Amount (INR)** | Qty × Rate, in rupees. | ₹ 16,10,402.04 |

   In the demo, the rice (**Procurement Cost**) comes from Sri Venkateswara Rice Mill at ₹ 29,900 per net MT. The bags (**Bags**) come from Sunrise Polymers at ₹ 22.50 per bag. **Sea Freight** is USD 1,695 per container.

   A costing that you make from the **Cheapest Port Board** has the same 13 cost heads as the story costing: **Procurement Cost**, **Bags**, **CFS Handling**, **Surveyor (POL)**, **Surveyor (Mill)**, **ECTN**, **ECTN Documentation**, **Sea Freight**, **THC**, **EQS**, **Seal**, **BL Fee** and **POD Expense**. They come from the **Loading Costing Template** and the **Discharge Costing Template** of the ports, and from the port lane rates. The rates are the rates of the day you made the costing, so some amounts can be different from the story costing.

4. On your own costing, to change a rate by hand, click the row, type the new **Rate** and click **Save**. The system calculates the amounts and the totals again.
5. To get new rates into the costing, click **Combinations**.

   ![The Combinations menu open, with Pull Mill Rates boxed](/files/setup-2-04-costing-rates-and-charges-03-combinations-menu-481f38e3.webp)

| Menu item | What it does |
|---|---|
| **Pull Vendor Rates** | Copies the rates that suppliers sent on a supplier quotation for this costing. |
| **Pull Mill Rates** | Copies the rates of today from the rate sheets of the mills, and the freight rates of each route, into **Raw Rates**. |
| **Pull Daily Cost Sheet** | Copies today's rates from the **Daily Cost Sheet** report. See [Other ways to start a costing](/setup/cost-the-deal/12-other-ways-to-start-a-costing). |

   A message shows how many rates were pulled. The rates go into the **Raw Vendor Rates** section, in the **Raw Rates** table. The **Charges** do not change yet. To choose which rates go into the charges, see [Pick the best combination](/setup/cost-the-deal/07-pick-the-best-combination).

## Check it worked

Each row of the **Charges** table has a **Rate** and a **Currency**. No orange message shows at the top of the costing.

## Good to know

- The charges of each port come from the costing templates of the route: the **Loading Costing Template** and the **Discharge Costing Template** on the **Deal** tab. To change a charge for every new costing, change the template. See [Costing templates per port](/setup/set-up-the-system/14-costing-templates).
- When a template charge was not updated for a long time, the costing shows the orange message "Some charge rates are stale — re-check them before quoting." The number of days is the **Rate Staleness Threshold (Days)** in **Export Settings**. Check the rate with the supplier, then update the template or the row.
- The **Raw Rates** table is a copy of the rates on the day you pulled them. Later changes on the rate sheets do not change it. Pull again to get the new rates.
- The **Vendor Sundries** section shows only when a selected supplier added small fees to the quotation.

## Next

[The costing: Cost Build-up and Quote tabs](/setup/cost-the-deal/05-costing-cost-build-up-and-quote)
