---
title: "The costing: Cost Build-up and Quote tabs"
space: "Setup Guide"
url: "https://jmtradelink.com/setup/cost-the-deal/05-costing-cost-build-up-and-quote"
updated: "2026-11-12"
---

The **Cost Build-up** tab adds up the charges, stage by stage, and adds your finance cost and your profit. The **Quote** tab shows the price per MT that you give the buyer.

At the end of this page, you can read the cost of the deal at each stage and set the price that you quote.

## Before you start

- Read [The costing: Rates & Charges tab](/setup/cost-the-deal/04-costing-rates-and-charges).
- In the demo, open the **Won** costing of the story (JMC-PI-2627-017).

## Steps

1. Open the costing and click the **Cost Build-up** tab.
2. In the **Markup** section, check **Finance Cost %** and **Profit %**. In the demo, both are 2.000. The system adds them to the cost of each stage to get the quote prices. On your own costing, to change them, type a new value and click **Save**.
3. Read the **Cost by Stage (INR)** section. Each total is the cost of the whole deal up to that stage, before finance and profit.

   ![The Cost by Stage (INR) section of the story costing, boxed](/files/setup-2-05-costing-cost-build-up-and-quote-01-cost-by-stage-4abb1f5b.webp)

| Field | What it adds | Demo value |
|---|---|---|
| **Ex-Works Total** | The rice and the bags at the mill. | ₹ 16,34,702.04 |
| **FOR Total** | The Ex-Works Total and the transport to the port. | ₹ 16,34,702.04 |
| **FOB Total** | The FOR Total and the charges at the port of loading. | ₹ 16,74,473.04 |
| **CFR Total** | The FOB Total and the sea freight. | ₹ 20,22,971.54 |
| **Insurance Amount (INR)** | CFR × 110% × 0.05%. | ₹ 1,112.63 |
| **CIF Total** | The CFR Total and the insurance. | ₹ 20,24,084.17 |

4. Read the **Finance & Profit (INR)** section. In the demo, **Total Finance (INR)** and **Total Profit (INR)** are each ₹ 40,481.68, that is ₹ 749.66 per MT.
5. Read the **Quote per Gross MT** section. It shows the price per gross MT, with finance and profit, at each stage, in INR, USD and EUR. In the demo, **CIF (USD)** is 415.812.
6. Click the **Quote** tab.

   ![The Quote tab with Set Price by Hand off and the Quoted Price per MT boxed](/files/setup-2-05-costing-cost-build-up-and-quote-02-quote-tab-c9b53c4e.webp)

| Field | What it means | Demo value |
|---|---|---|
| **Quote Currency** | The currency of the price for the buyer. | USD |
| **Quote UOM** | The unit of the price. | MT |
| **Quoted Price per MT** | The price for the buyer, in the Quote Currency, rounded to a whole unit. It is on the **Incoterm** of the **Deal** tab: CIF in the demo. | 417 |
| **Quoted Value (INR)** | The price × the net MT, in rupees. | ₹ 21,05,573.74 |

7. On your own costing, to type your own price, tick **Set Price by Hand**. The **Quoted Price per MT** field opens for typing.

   ![The Quote tab with Set Price by Hand ticked, boxed](/files/setup-2-05-costing-cost-build-up-and-quote-03-set-price-by-hand-6ababaf4.webp)

8. Type the price and click **Save**. The **Quoted Value (INR)** changes.

## Check it worked

The **Quoted Price per MT** shows a price in the **Quote Currency**. In the demo it is 417 USD.

## Good to know

- The numbers change every day with the exchange rate, so yours differ a little from the ones on this page.
- The buyer pays for the net weight of the rice. The **Quote per Gross MT** section divides the cost by the gross weight. The **Quoted Price per MT** spreads the same cost over the net weight, so it is a little higher: 417 USD, not 415.812.
- When **Set Price by Hand** is off, the system calculates the price again each time you save. When it is on, the system keeps your price. If you change the **Quote Currency**, the system calculates the price again.
- To quote in EUR, change the **Quote Currency** to EUR and click **Save**.

## Next

[The costing: Destination Margin tab](/setup/cost-the-deal/06-costing-destination-margin)
