---
title: "Do the inspection"
space: "Setup Guide"
url: "https://jmtradelink.com/setup/inspection-agency/03-do-the-inspection"
updated: "2026-11-12"
---

The steps of the inspection are in chapter 3, [Run the shipment](/setup/run-the-shipment/01-welcome). This page tells you which pages to read, in order.

## Before you start

Finish [See your assigned work](/setup/inspection-agency/02-see-your-assigned-work).

## The pages to read

| Your work | Page |
|---|---|
| Sign in with a mobile number, and what a surveyor can and cannot do | [Ravi's quick start](/setup/run-the-shipment/17-ravis-quick-start) |
| Fill the readings and the photos of a heap | [Inspect the heap](/setup/run-the-shipment/07-inspect-the-heap) |
| Check the empty container before loading | [Inspect the empty container](/setup/run-the-shipment/09-inspect-the-empty-container) |
| Load the bags and seal the container | [Load and seal](/setup/run-the-shipment/10-load-and-seal) |

The agency manager also reads [Assign the day](/setup/run-the-shipment/05-assign-the-day).

## Next

[Inspect the heap](/setup/run-the-shipment/07-inspect-the-heap)
