title: "From a new shipment to the vessel"
space: "Setup Guide"
url: "https://jmtradelink.com/setup/run-the-shipment/01-welcome"
updated: "2026-11-12"
---

At the end of this chapter, you can take one export shipment from the day you create it to the day the vessel sails.

## Before you start

Make the shipment from a won Export Costing with **Create > Sales Order & Shipment**. See [Make the order and the shipment](/setup/cost-the-deal/10-make-the-order-and-shipment) and [The demo story](/setup/get-started/02-the-demo-story).

## The story

A buyer in Cotonou orders 2 containers of IR64 parboiled rice. Priya, the export coordinator, makes a shipment from the won costing. The mill has 1,080 bags of 50 kg ready at its yard, which is 54.00 MT. Ravi and Kiran are surveyors at the inspection agency. They check the rice and the containers at the mill. Meena, the manager of the agency, sends them to the mill on the correct days.

The story shipment is the **Shipped** one (SHIP-2026-0051). The other four demo shipments show the same work at earlier steps.

| Status | Shipment | Steps you can see on it |
|---|---|---|
| Planned | SHIP-2026-0055 | Complete the shipment details, make the stuffing plan, create the inspections, assign the day, add a heap |
| Inspecting | SHIP-2026-0054 | Inspect the heap, accept or reject the heap, inspect the empty container |
| Loading | SHIP-2026-0053 | Load and seal |
| Ready to Ship | SHIP-2026-0052 | Watch progress and warnings, mark as shipped |
| Shipped | SHIP-2026-0051 | Prepare the export documents, track the vessel, raise the sales invoice |

## Who does what

Do the pages in this order.

| Page | Who |
|---|---|
| [Complete the shipment details](/setup/run-the-shipment/02-complete-the-shipment) | Priya |
| [Make the stuffing plan](/setup/run-the-shipment/03-make-the-stuffing-plan) | Priya |
| [Create the inspections](/setup/run-the-shipment/04-create-the-inspections) | Priya |
| [Assign the day](/setup/run-the-shipment/05-assign-the-day) | Meena, then Priya |
| [Add a heap](/setup/run-the-shipment/06-add-a-heap) | Priya |
| [Inspect the heap](/setup/run-the-shipment/07-inspect-the-heap) | Ravi |
| [Accept or reject the heap](/setup/run-the-shipment/08-accept-or-reject-the-heap) | Priya |
| [Inspect the empty container](/setup/run-the-shipment/09-inspect-the-empty-container) | Ravi |
| [Load and seal](/setup/run-the-shipment/10-load-and-seal) | Ravi |
| [Watch progress and warnings](/setup/run-the-shipment/11-watch-progress-and-warnings) | Priya |
| [Prepare the export documents](/setup/run-the-shipment/12-prepare-the-export-documents) | Priya |
| [Mark as shipped](/setup/run-the-shipment/13-mark-as-shipped) | Priya |
| [Track the vessel](/setup/run-the-shipment/14-track-the-vessel) | Priya |
| [Raise the sales invoice](/setup/run-the-shipment/15-raise-the-sales-invoice) | Priya |
| [Undo or fix a mistake](/setup/run-the-shipment/16-undo-or-fix-a-mistake) | Priya |
| [Ravi's quick start](/setup/run-the-shipment/17-ravis-quick-start) | Ravi |

## Check it worked

1. Click **Home** in the left sidebar, then click **Export Shipment**.
2. Click the **Planned** shipment (SHIP-2026-0055). The **Status** is **Planned**.

![The Export Shipment form of the Planned shipment, with the Status Planned boxed](/files/setup-3-01-welcome-01-shipment-planned-3c2e857c.webp)

3. Go back to the list and click the **Shipped** shipment (SHIP-2026-0051). The **Status** is **Shipped**. This is where the chapter ends.

## Good to know

The shipment status changes by itself as the work moves on. You do not set it, except **Cancelled**.

| Status | When |
|---|---|
| Planned | No heap and no container inspection has started. |
| Inspecting | The stuffing plan has a heap, or a container inspection is past Planned. |
| Loading | A container inspection is in Loading or a later step. |
| Ready to Ship | Every container has a container inspection, and all of them are Done. |
| Shipped | Priya clicked **Mark as Shipped**. |
| Cancelled | Priya sets it by hand in **Status** when the deal stops. |

After **Shipped** or **Cancelled**, the status does not change again.

**Readiness** follows the status. **Loading** gives **Partially Ready**. **Ready to Ship** and **Shipped** give **Ready**. Every other status gives **Not Ready**.

When the shipment is made, the system also makes two draft Purchase Orders: one for the rice to the mill and one for the bags. Priya submits the rice Purchase Order before she adds a heap. In the demo data, the rice Purchase Order of every shipment is already submitted.

:::note[A shipment has one mill]
The system buys all the rice of one shipment from one mill. The mill shows in **Mill** on the shipment.
:::

## Next

[Complete the shipment details](/setup/run-the-shipment/02-complete-the-shipment)