---
title: "Create the inspections"
space: "Setup Guide"
url: "https://jmtradelink.com/setup/run-the-shipment/04-create-the-inspections"
updated: "2026-11-12"
---

Each container needs its own check at the mill. Priya makes one container inspection for each container.

At the end of this page, the plan has two container inspections, one for each loading day.

## Before you start

Finish [Make the stuffing plan](/setup/run-the-shipment/03-make-the-stuffing-plan). Priya signs in as shown in [Sign in and find your way](/setup/get-started/01-sign-in-and-find-your-way).

The first picture shows the plan of the **Planned** shipment (STP-2026-0009), which has no container inspections yet.

## Steps

1. In the search bar, type **Stuffing Plan** and open the plan of the **Planned** shipment (STP-2026-0009).
2. Click **Inspections > Create Inspections**.

   ![The Inspections menu of the stuffing plan, with Create Inspections boxed](/files/setup-3-04-create-the-inspections-01-create-inspections-7aac417d.webp)

3. The system shows "2 Container Inspections created". If every container already has an inspection, it shows "Every container already has an inspection".

## Check it worked

1. At the top of the stuffing plan, under **Inspections**, click **Container Inspection**.
2. The list shows two container inspections in the **Planned** step.
3. The first has **Planned Date** 24-11-2026. The second has **Planned Date** 25-11-2026.

Right after **Create Inspections**, the new rows are in the **Planned** step. They move to **Assigned** after Priya clicks **Actions > Assign** on each one, as shown in [Assign the day](/setup/run-the-shipment/05-assign-the-day).

The picture shows the two container inspections of the **Inspecting** shipment (CNI-2026-0007 and CNI-2026-0008, plan STP-2026-0008). They are already in the **Assigned** step. Their **Planned Date** is 15-11-2026 and 16-11-2026.

![The Container Inspection list of the Inspecting shipment's plan, with the step Assigned boxed on both rows](/files/setup-3-04-create-the-inspections-02-inspection-list-618c10c0.webp)

## Good to know

The system gives the dates in day order. Each day gets as many container inspections as its **Containers Planned**. A container inspection that does not fit in a day gets no **Planned Date**.

:::note[Click it again after you add days]
**Create Inspections** fills the dates that are empty. It also makes a container inspection for each new container row on the shipment. It does not make a second one for a container.
:::

The shipment status changes to **Inspecting** only when the first heap is added, or when a container inspection leaves **Planned**.

## Next

[Assign the day](/setup/run-the-shipment/05-assign-the-day)
