Meena gets the plan from Priya. Meena sends Ravi to the mill on 24-11-2026 and 25-11-2026.

At the end of this page, both container inspections are in the **My Inspections** list of Ravi, in the **Assigned** step.

## Before you start

Finish [Create the inspections](/setup/run-the-shipment/04-create-the-inspections). Meena signs in with the ASI Manager role (see [Sign in and find your way](/setup/get-started/01-sign-in-and-find-your-way)). The picture on this page shows the plan of the **Planned** shipment (STP-2026-0009).

## Steps

1. In the search bar, type **Stuffing Plan** and open the plan of the **Planned** shipment (STP-2026-0009).
2. Click **Inspections > Assign Day**.
3. In the **Assign Day** dialog, enter the values:
   - **Day**: select 24-11-2026.
   - **Surveyor**: shows the user of Ravi, from the **Default Surveyor** of that day. Change it only to send another surveyor.

   ![The Assign Day dialog, with Day and Surveyor boxed](/files/setup-3-05-assign-the-day-01-assign-day-dialog-9281939e.webp)

4. Click **Assign**. The system shows "Day assigned to" and the user of Ravi.

5. Do steps 2 to 4 again for 25-11-2026.
6. Priya signs in. On the plan, under **Inspections**, she clicks **Container Inspection**, opens each one and clicks **Actions > Assign**. The step changes to **Assigned**, and the shipment status changes to **Inspecting**.

## Check it worked

Ravi opens the **My Inspections** workspace and clicks **Containers**, then removes the **Planned Date** filter. The list shows the two container inspections in the **Assigned** step.

## Good to know

**Assign Day** assigns every container inspection that has that **Planned Date**. If a heap is already linked to these container inspections, it assigns the heap too. It removes the open assignments of other users from these documents. The step of the container inspection does not change.

:::note[Only the exporter moves Planned to Assigned]
The **Assign** action is for Priya's roles: System Manager, Stock Manager or Purchase Manager. Meena and Ravi cannot do it.
:::

If the dialog shows "Add the stuffing days first.", add rows under **Loading Days** on the plan.

## Next

[Add a heap](/setup/run-the-shipment/06-add-a-heap)