---
title: "Add a heap"
space: "Setup Guide"
url: "https://jmtradelink.com/setup/run-the-shipment/06-add-a-heap"
updated: "2026-11-12"
---

The mill has the first heap ready. It holds enough rice for both containers.

At the end of this page, the plan has one heap that covers 2 containers, and Ravi has it in his list.

## Before you start

Finish [Assign the day](/setup/run-the-shipment/05-assign-the-day). The rice Purchase Order of the shipment is submitted (see [From a new shipment to the vessel](/setup/run-the-shipment/01-welcome)). The pictures on this page show the **Planned** shipment (SHIP-2026-0055).

## Steps

1. In the search bar, type **Stuffing Plan** and open the plan of the **Planned** shipment (STP-2026-0009). Click **Inspections > Add Heap**.
2. In the **Add Heap** dialog, enter the values:
   - **Containers Covered**: 2.
   - **Surveyor**: type **ravi** and pick ravi.kumar@demo.example.com. If today is a loading day, the system fills this field with the **Default Surveyor** of that day.

   ![The Add Heap dialog, with Containers Covered and Surveyor boxed](/files/setup-3-06-add-a-heap-01-add-heap-1e8fcfc5.webp)

3. Click **Add Heap**. A green message shows "Heap inspection MAT-QA-2026-… added".

## Check it worked

1. Ravi signs in (see [Ravi's quick start](/setup/run-the-shipment/17-ravis-quick-start)). In the **My Inspections** workspace, he clicks **Heap Inspections** and sees the new heap.
2. The new heap shows with the status **Rejected**. This is correct. A heap with no readings is Rejected until Ravi fills them.
3. On the shipment, the status is **Inspecting**.

To see a heap that is added already, look at the heap of the **Inspecting** shipment (MAT-QA-2026-00009).

## Good to know

When you add a heap, the system does these things:

- It makes a draft Purchase Receipt for the heap from the rice Purchase Order. The quantity is the net weight of the rice for the containers it covers. For the 2 containers of the **Inspecting** shipment, it is 53.86 MT, the net weight of the shipment. The receipt goes to the **Receiving Warehouse** of **Export Settings**.
- It fills the heap readings from the **Heap Inspection Template** of the rice item.
- It assigns the heap to the surveyor. If you leave **Surveyor** empty, the heap is set to you, and it shows in no surveyor's list.

:::note[A heap covers a fixed number of containers]
You cannot change **Containers Covered** after the heap is added. For more containers, add one more heap.
:::

| Message | What to do |
|---|---|
| Submit the Purchase Order first: … is still a draft. | Submit the rice Purchase Order of the shipment. |
| Create the Purchase Order first: Export Shipment … has no rice order to the mill. | On the shipment, click **Create > Purchase Orders**. |
| Set the Receiving Warehouse in Export Settings before receiving rice from the mill. | Fill **Receiving Warehouse** in **Export Settings**. |
| A heap must cover at least one container. | Enter 1 or more in **Containers Covered**. |
| Add container rows to Export Shipment … first. | On the shipment, add the containers. |

## Next

[Inspect the heap](/setup/run-the-shipment/07-inspect-the-heap)
