Priya is at her desk in the office. She follows the loading from the stuffing plan.

At the end of this page, you know how far the loading is and what is late.

## Before you start

Finish [Load and seal](/setup/run-the-shipment/10-load-and-seal). Priya signs in as shown in [Sign in and find your way](/setup/get-started/01-sign-in-and-find-your-way). The picture on this page shows the stuffing plan of the **Loading** shipment (SHIP-2026-0053). Its first container is **Loaded & Sealed**, its second container is still in **Loading**, and it has a rejected heap.

## Steps

1. In the search bar, type **Stuffing Plan** and open the plan of the **Loading** shipment. The plan shows the shipment number at the top (SHIP-2026-0053).
2. Read the blue line under the title. On this plan it shows "1 of 2 loaded, 0 days left". "0 days left" means the **Last Loading Date** of the shipment has passed. When that date is still ahead, the line also shows "need …/day". For example, the plan of the **Inspecting** shipment shows "0 of 2 loaded, 8 days left, need 1/day".
3. Read the yellow lines above the blue line. Each yellow line is a warning. This plan shows two:
   - "12-11-2026 is after the last loading date 11-11-2026." The second loading day is after the **Last Loading Date**.
   - "Heap MAT-QA-2026-00008 was rejected; Purchase Receipt PR-26-00014 is kept and not received."

   ![The top of the stuffing plan, with the rejected heap warning and the blue progress line boxed](/files/setup-3-11-watch-progress-and-warnings-01-progress-and-warning-0258c537.webp)

4. In the search bar, type **Export Shipment** and open the **Loading** shipment. Read the blue line at the top of the form. It shows "Status: Loading · Documents: 0/12 final · Readiness: Partially Ready". The **Status** field is in the **Deal** tab.
5. Open the **Progress** tab. Under **Readiness**, read **Readiness** (Partially Ready), **Required Containers** (2) and **Required Net MT** (53.860).

## Check it worked

After the second container is **Loaded & Sealed**, the blue line shows "2 of 2 loaded". The **Ready to Ship** shipment (SHIP-2026-0052) is in this state: its stuffing plan shows "2 of 2 loaded, 0 days left", and its status is **Ready to Ship**.

## Good to know

The blue line counts containers in **Loaded & Sealed** or a later step. "Days left" counts to the **Last Loading Date** of the shipment, today included. The **Last Loading Date** and the **Free Pickup Date** are on the shipment's **Booking** tab. The system sets **Free Pickup Date** to 9 days before the **Gate Open Date**.

| Yellow warning | What it means |
|---|---|
| … is after the last loading date … | A loading day is after the **Last Loading Date**. Move the day or ask the shipping line for more time. |
| … is before the free pickup date … | A loading day is before the **Free Pickup Date**. Move the day or change the **Gate Open Date**, or check the pickup terms with the shipping line. |
| Heap … was rejected; Purchase Receipt … is kept and not received. | Priya submitted a rejected heap. The yellow line stays. [Add a new heap](/setup/run-the-shipment/06-add-a-heap) for its containers. |

:::note[The shipment status follows the container inspections]
The status changes when you add a heap, when you create inspections and when a container inspection changes step.
:::

## Next

[Prepare the export documents](/setup/run-the-shipment/12-prepare-the-export-documents)