---
title: "Check a route before use"
space: "Setup Guide"
url: "https://jmtradelink.com/setup/set-up-the-system/17-route-cost-preview"
updated: "2026-11-12"
---

Before Priya quotes a buyer on a new route, the administrator checks that the route has all its charges. The report **Route Cost Preview** shows, in one table, each charge that a costing for the route gets: the loading template, the port lane rate and the discharge template.

At the end of this page, you can see that each stage of the route has a charge line, or you know which part is missing.

## Before you start

- You need the System Manager or the Purchase Manager role. The demo user Priya has both.
- The parts of the route must exist: [Costing templates](/setup/set-up-the-system/14-costing-templates) and [Port lane rates (ocean freight)](/setup/set-up-the-system/16-port-lane-rates).
- The demo route Visakhapatnam to Cotonou, 20' FCL, has all its parts. The demo route Nhava Sheva to Lome has no discharge template. See [Install and remove demo data](/setup/settings-and-users/03-install-and-remove-demo-data).

## Steps

### Open the report

1. In the search bar, type **Route Cost Preview** and open the report.
2. Set the filters:
   - **Port of Loading**: **Visakhapatnam**. This filter is necessary.
   - **Port of Discharge**: **Cotonou**.
   - **Shipping Line**: leave it empty to use the rate that is good for every line, or select a line.
   - **Container Type**: **20' FCL**.

   ![The Route Cost Preview report with the filters Visakhapatnam, Cotonou and 20' FCL boxed](/files/setup-8-17-route-cost-preview-01-report-filters-09c81eb1.webp)

### Read the charge lines

3. The report shows one row for each charge. The columns are:

| Column | What it shows |
|---|---|
| **Piece** | The part of the route: **Loading**, **Lane** or **Discharge**. |
| **Source** | The record that has the charge: the costing template or the port lane rate. Click it to open the record. |
| **Cost Head** | The charge. |
| **Stage** | The point in the price where the charge is added, for example **FOB**, **CFR** or **Destination**. |
| **Basis** | How the charge is calculated, for example **Per Container** or **Per Bag**. |
| **Rate** | The amount, in the currency of the next column. |
| **Currency** | The currency of the rate. |

4. For Visakhapatnam to Cotonou, 20' FCL, the report shows six rows:
   - **Loading**, from **Cotonou Export**: **Surveyor (POL)**, **Surveyor (Mill)**, **ECTN** and **ECTN Documentation**, all with the stage **FOB**.
   - **Lane**, from the port lane rate **LANE-2026-00003**: **Sea Freight**, **CFR**, **Per Container**, 1,695 **USD**.
   - **Discharge**, from **Cotonou Discharge**: **POD Expense**, **Destination**, **Per Bag**, 3,183 **XOF**.

   ![The charge lines of the route Visakhapatnam to Cotonou, with the Cost Head to Currency columns boxed](/files/setup-8-17-route-cost-preview-02-report-rows-32662482.webp)

## Check it worked

1. Each stage of the route has at least one row: **FOB** from the loading template, **CFR** or **CIF** from the port lane rate and **Destination** from the discharge template.
2. If a part is missing, the report shows a message above the table, one line for each missing part. For example, **Kakinada** to **Lome**, **20' FCL** shows "No 20' FCL route from Kakinada to Lome" and "No discharge template for Lome".
3. To see one message, change the filters to **Nhava Sheva**, **Lome**, **MSC** and **20' FCL**. The report shows the rows of the loading template **MSC – Lome** and the port lane rate, and the message "No discharge template for Lome".

   ![The report for Nhava Sheva to Lome, MSC, with the message No discharge template for Lome boxed](/files/setup-8-17-route-cost-preview-03-report-missing-b16403b9.webp)

The messages that you can see are:

| Message | What to do |
|---|---|
| No loading template for {port} | Add a loading template for the port of loading. See [Costing templates](/setup/set-up-the-system/14-costing-templates). |
| No {container type} route from {port} to {port}, plus " for {shipping line}" when a **Shipping Line** is set | Add a port lane rate for the route and container type. See [Port lane rates (ocean freight)](/setup/set-up-the-system/16-port-lane-rates). |
| No discharge template for {port} | Add a discharge template for the port of discharge. See [Costing templates](/setup/set-up-the-system/14-costing-templates). |

## Good to know

- The report only reads the setup. It does not make or change a costing.
- The report uses the same parts as a new costing on the same date. So a route with no message, with all four filters set, gives a costing with no missing charge.
- The report shows the rates in their own currencies. It does not add them up. To see the parts of the route in cards, open the **Complete Cost** window on the route map. See [Build routes on the map](/setup/set-up-the-system/15-route-rates-map).
- Select a **Container Type**. The port lane rate is for one container size, so without it the report shows no **Lane** row and no message about the freight.

## Next

[Supply locations and mill rate templates](/setup/set-up-the-system/18-supply-locations-and-rate-templates)
