Setup Guide

Setup Guide

Open in ChatGPT
Ask ChatGPT about this page
Open in Claude
Ask Claude about this page

Add a heap

The mill has the first heap ready. It holds enough rice for both containers.

At the end of this page, the plan has one heap that covers 2 containers, and Ravi has it in his list.

Before you start

Finish Assign the day. The rice Purchase Order of the shipment is submitted (see From a new shipment to the vessel). The pictures on this page show the Planned shipment (SHIP-2026-0055).

Steps

  1. In the search bar, type Stuffing Plan and open the plan of the Planned shipment (STP-2026-0009). Click Inspections > Add Heap.

  2. In the Add Heap dialog, enter the values:

    • Containers Covered: 2.
    • Surveyor: type ravi and pick ravi.kumar@demo.example.com. If today is a loading day, the system fills this field with the Default Surveyor of that day.

    The Add Heap dialog, with Containers Covered and Surveyor boxed

  3. Click Add Heap. A green message shows "Heap inspection MAT-QA-2026-… added".

Check it worked

  1. Ravi signs in (see Ravi's quick start). In the My Inspections workspace, he clicks Heap Inspections and sees the new heap.
  2. The new heap shows with the status Rejected. This is correct. A heap with no readings is Rejected until Ravi fills them.
  3. On the shipment, the status is Inspecting.

To see a heap that is added already, look at the heap of the Inspecting shipment (MAT-QA-2026-00009).

Good to know

When you add a heap, the system does these things:

  • It makes a draft Purchase Receipt for the heap from the rice Purchase Order. The quantity is the net weight of the rice for the containers it covers. For the 2 containers of the Inspecting shipment, it is 53.86 MT, the net weight of the shipment. The receipt goes to the Receiving Warehouse of Export Settings.
  • It fills the heap readings from the Heap Inspection Template of the rice item.
  • It assigns the heap to the surveyor. If you leave Surveyor empty, the heap is set to you, and it shows in no surveyor's list.
Message What to do
Submit the Purchase Order first: … is still a draft. Submit the rice Purchase Order of the shipment.
Create the Purchase Order first: Export Shipment … has no rice order to the mill. On the shipment, click Create > Purchase Orders.
Set the Receiving Warehouse in Export Settings before receiving rice from the mill. Fill Receiving Warehouse in Export Settings.
A heap must cover at least one container. Enter 1 or more in Containers Covered.
Add container rows to Export Shipment … first. On the shipment, add the containers.

Next

Inspect the heap

Last updated 2 weeks ago
Was this helpful?
Thanks!