Undo or fix a mistake
After the shipping, Priya sees a wrong Net Wt (Kg) on one container of the shipment. The Delivery Note quantity comes from these weights, so she undoes the shipping, fixes the weight and ships again.
At the end of this page, you can undo a shipping and correct the usual mistakes.
Before you start
Finish Mark as shipped. Priya signs in as shown in Sign in and find your way. The picture on this page shows the Delivery Note (DN-26-00001) of the Shipped shipment (SHIP-2026-0051). Do not cancel it on the demo site.
Practise these steps only on a test site, on a shipment that you made for practice. Never practise them on a real shipment.
To correct BL No, BL Date or Actual Time of Departure after the shipping, you do not need this page. Correct the field on the Logistics tab and click Save.
Steps
-
In the search bar, type Export Shipment and open the shipment. In the Documents tab, under Delivery, click Delivery Note to open it.
-
Click Cancel. The system asks you to confirm. Click Yes.

-
Open the shipment again. The status is Ready to Ship, and Delivery Note is empty.
-
In the Cargo tab, in the Containers table, correct Net Wt (Kg) of the container and click Save.
-
Ship again. Do steps 3 to 6 of Mark as shipped. The system makes a new Delivery Note with the corrected quantity.
Check it worked
The shipment is Shipped again and links the new Delivery Note. The old Delivery Note shows Cancelled.
Good to know
| Mistake | How to fix it |
|---|---|
| A wrong number on a container inspection before Seal | Correct the field and click Save. |
| A wrong number on a container inspection after Seal | Correct it on the container inspection, and also in the Containers table on the shipment's Cargo tab. After the Seal, the shipment row does not change by itself. |
| The container failed the empty check | Click Actions > Recheck. The same container inspection goes back to Assigned. Enter the replacement container in Container No and do the empty check again. |
| The heap is rejected | On the stuffing plan, click Inspections > Add Heap. Inspect and accept the new heap (Inspect the heap, Accept or reject the heap). Then select it in Heap Inspection on each container inspection. |
| A heap covers too few containers | On the stuffing plan, click Inspections > Add Heap and set Containers Covered to the other containers. Inspect and accept it, then select it on those container inspections. |
| A loading day is wrong | Change the row under Loading Days and click Save. Then, on each container inspection of that day, change Planned Date and click Save. Then click Inspections > Assign Day for the new date. |
| The wrong surveyor got the day | Do Assign Day again with the correct surveyor. The system removes the old assignment. |